archive-es.com » ES » I » IDEAM.ES

Total: 419

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • IDEAM - Construction Project for the Metro line 3 extension infrastructure. Villaverde coach depots
    Metro line 3 extension infrastructure Villaverde coach depots Location Madrid Spain Structural typology Steel and concrete composite structure Property MINTRA Builder Isolux Corsan Corviam Work scope Detail Design and Technical Assistance Architect Iberinsa Ending year 2 006 Technical data Built

    Original URL path: http://www.ideam.es/proyecto_de_construccion_de_la_infraestructura_de_prolongacion_de_la_linea_3_de_metro_cocheras_villaverde (2016-04-27)
    Open archived version from archive


  • IDEAM - Construction Project for the enlargement of the Metro. Hortaleza coach garages and depots
    Construction Project for the enlargement of the Metro Hortaleza coach garages and depots Location Madrid Spain Structural typology Screen piled containment precast girders and hallow cored slabs for roofing Property MINTRA Builder Ploder Work scope Detail Design and Technical Assistance Architect Iberinsa Ending year 2 006 Technical data Built area 14 000 m 2 10000 m2 for coach depots and 4000 m2 for tunnel Forged Precast concrete girders hollow core

    Original URL path: http://www.ideam.es/proyecto_de_construccion_de_la_ampliacion_de_la_cocheras_y_talleres_de_hortaleza_de_metro_de_madrid (2016-04-27)
    Open archived version from archive

  • IDEAM - Construction Project for the new Metro Line 1. Ensanche de Vallecas coach depots
    direction Previous studies and Project drafts Other projects Construction Project for the new Metro Line 1 Ensanche de Vallecas coach depots Location Madrid Spain Structural typology Steel and precast concrete structures Property MINTRA Builder Copasa Sando Work scope Detail Design and Technical Assistance Architect Iberinsa Ending year 2 006 Technical data Built area 65 000 m 2 Forged Precast and cast in place concrete structure back Jorge Juan 19 3º

    Original URL path: http://www.ideam.es/proyecto_de_construccion_de_nuevas_cocheras_de_metro_en_el_ensanche_de_vallecas_linea_1 (2016-04-27)
    Open archived version from archive

  • IDEAM - Construction Project for the new Metro Line 1, Hortaleza coach depots
    Previous studies and Project drafts Other projects Construction Project for the new Metro Line 1 Hortaleza coach depots Location Madrid Spain Structural typology Screen piled containment precast girders and hollaw cored roofing Property MINTRA Builder Aldesa Coalvi Work scope Detail Design and Technical Assistance Architect Iberinsa Ending year 2 007 Technical data Built area 45 760 m 2 Forged Precast beans and hollaw cored slabs basically back Jorge Juan 19

    Original URL path: http://www.ideam.es/proyecto_de_construccion_de_nuevas_cocheras_para_material_movil_del_metro_de_madrid_en_hortaleza_linea_1 (2016-04-27)
    Open archived version from archive

  • IDEAM - Third Crossing of the Tagus Contest. Stretch: Lisbon-Poceirao
    standard span for 4 railroad tracks and 6 road lanes Property RAVE Builder FCC Conduril Impregilo Cimolai Consortium Work scope Tender with Detail Design and Construction Engineering including main solution and alternative studies of main cable stayed bridge intermediate bridges and access viaducts Technical data Overall length 8 184 meters Main bridge 1140 Access Viaducts 540 950 Ubterneduate brudges 5554 Span lengths Cablestayed bridge 540 tramo principal channel bridges 190

    Original URL path: http://www.ideam.es/concurso_tercera_travesia_del_tajo_tramo_lisboa_poceirao (2016-04-27)
    Open archived version from archive

  • IDEAM - A-3 steel and concrete composite fly-over on the A-40 motorway
    projects A 3 steel and concrete composite fly over on the A 40 motorway Location Castilla La Mancha A 40 Motorway Spain Structural typology Steel and concrete composite hollow box girder with lateral structures and single supports at piers Property Spanish Ministry of Public Works Roads Bureau Work scope Detail Design Technical data Overall length 140 m Span lengths 30 40 40 30 Road width 14 10 m Curvature radios

    Original URL path: http://www.ideam.es/puente_mixto_sobre_la_a_3_en_la_a_40 (2016-04-27)
    Open archived version from archive

  • IDEAM - Bridge over River Guadalquivir at the Seville North-Huelva detour road
    studies and Project drafts Other projects Bridge over River Guadalquivir at the Seville North Huelva detour road Location Sevilla Spain Structural typology Precast concrete deck with multiple simple supported spans Property Spanish Ministry of Public Works Builder Cubiertas y Mzov SA Work scope Detail Design and Construction Engineering Ending year 1 992 Technical data Overall length Span lengths between 22 and 44 m Width 7 30 m back Jorge Juan

    Original URL path: http://www.ideam.es/puente_sobre_el_rio_guadalquivir_en_la_variante_norte_de_sevilla_a_huelva (2016-04-27)
    Open archived version from archive

  • IDEAM - Faulty girder inspection for the EC-1 Viaduct on the Alcañiz detour road. Province of Teruel
    Technical Assistance Construction direction Previous studies and Project drafts Other projects Faulty girder inspection for the EC 1 Viaduct on the Alcañiz detour road Province of Teruel Location Variante de Alcañiz Teruel back Jorge Juan 19 3º Madrid 28001 telf

    Original URL path: http://www.ideam.es/inspeccion_de_una_viga_del_viaducto_ec_1_de_la_variante_de_alcaniz_teruel (2016-04-27)
    Open archived version from archive



  •