archive-es.com » ES » I » IDEAM.ES

Total: 419

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • IDEAM - Transversal South Bridge. C/ Herrera Oria. Madrid
    Other projects Transversal South Bridge C Herrera Oria Madrid Location Chamartín Madrid Spain Property DUCH Desarrollo Urbanísco Charmatín Architect Ricardo Bofill Ending year 1 998 Technical data Length 236 meters Span lengths 176 10 50 Width 28 m Piers height

    Original URL path: http://www.ideam.es/Puente_Transversal_Sur_Herrera_Oria_DUCH (2016-04-27)
    Open archived version from archive


  • IDEAM - Emergency inspection and urgency actions of the Viaducts over the River Guadalentín after the earthquake of Lorca
    of Public Works Builder Composan FCC Joint Venture Work scope Emergency Inspection Emergency Repairing Project and Technical Support during construction Technical data Overall length Right Viaduct 384 m 16 spans of 24 m Overall length Left Viaduct 336 m 14 spans of 24m Executed solutions Replacement of bearing systems Disposal of bracing beams between beams in all the support lines Cuts in the ends of precast beams to ensure the

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=283&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Emergency actions of the Bridge over the Guadalfeo River. Road N-340
    Builder Betazul S A Work scope Main inspection Repairing Project and Technical Support Technical data Overall length 110 m Span lengths 5 spans of 22 30 m Executed solutions Demolition of the half lap joint Improvement of the bearing conditions of the half lap joint achieved cutting the old reinforcement and arranging mechanic sleeves with new reinforcement Reinforcement of the main resisting mechanism of the bearing Arrangement of stainless steel

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=284&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Emergency Actions after the impact of a vehicle with the main beams of the bridge
    edge beam and damage to the following beams Depending on the magnitude of the impact Loss of concrete mass in the cross section Complete breakage of the bottom flange of the beams Partial or complete breakage of prestressing tendons Complete or partial breakage of concrete reinforcement Longitudinal cracks between the web and the top flange Movement of bearing systems Proposed actions Depending on the damage after the impact Local repairing

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=286&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Emergency actions in a Bridge connecting M-40 and M-21
    2 011 Technical data Overall length 119 60 m Span lengths 24 2x35 80 24 m Pathologies Important and systemic presence of cracks generated by chemical effects on the concrete elements Water stagnation in the slab s alveoulus Insufficient torsional capacity Irregular surface of the platform Executed solutions Injection and sealing the cracks in the abutments strut Augmentation of the central core of the deck s cross section and widening

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=287&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Emergency actions in Underpass UP 0.0 and Zurguén Viaduct
    Underpass 50m Zurguén Viaduct 194 m Pathologies Reinforced soil walls breakage in E 2 abutment and UP 0 0 that may lead to an instable situation of the structure Important settlements suffered by the access embankment Executed solutions Provisional girder framework E 2 abutment s wall stabilization by refilling the lost volume of material in the embankment and the installation of rockfill wall Execution of a sustaining wall in E

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=288&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Emergency actions over river Uncín bridge
    Spanish Ministry of Public Works Builder Composan Work scope Assessment report and proposal of undertakings Ending year 2 011 Technical data Overall length 24 10 m Span lengths 9 m Pathologies Foundation scour with loss of masonry pieces from the front wall at abutment 2 with the subsequent appearance of a crack running along the vault Lack of vehicle restraint devices barriers Executed solutions Repair of foundation scour under front

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=289&project_category_id=4 (2016-04-27)
    Open archived version from archive

  • IDEAM - Bridge over river Lena at chainage point 50+000 on A-66 motorway (double carriageway)
    Other projects Bridge over river Lena at chainage point 50 000 on A 66 motorway double carriageway Location Asturias Spain Property Spanish Ministry of Public Works Work scope Inspection and repair proposal reports and Technical Assistance Technical data Length 112 m Span lengths 23 50 3x24 16 50 Pathologies Scour under abutment 1 and pier 1 Madrid bound carriageway Abutment piled foundation left exposed due to the river s erosive

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=290&project_category_id=4 (2016-04-27)
    Open archived version from archive