archive-es.com » ES » I » IDEAM.ES

Total: 419

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • IDEAM - Viaduct over river Tajo in Talavera de la Reina
    over river Tajo in Talavera de la Reina Location Southwest detour road at Talavera de la Reina Toledo Spain Structural typology Spans 1 2 and 3 prestressed concrete hollow box bean Span 3 main segment with steel concrete composite twin girder embedded in concrete hollow boxes at the piers Property Spanish Ministry of Public Works Roads Bureau Builder Sacyr Work scope Detail Design and Technical Assistance Ending year 2 015

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=316&project_category_id=11 (2016-04-27)
    Open archived version from archive


  • IDEAM - Composite steel and concrete viaducts in the AP-7 higway. Fornells de la Selva junction
    Composite steel and concrete viaducts in the AP 7 higway Fornells de la Selva junction Location AP 7 Higway Fornells de la Selva junction Gerona Spain Structural typology Constant depth steel concrete composite hollow boxes and curved plan Property Spanish Ministry of Public Works Builder Dragados S A Work scope Detail Design and Technical Assistance Ending year 2 013 Technical data Overall length Structure I 271 50 m Span lengths

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=317&project_category_id=11 (2016-04-27)
    Open archived version from archive

  • IDEAM - Bridge over river Grande
    drafts Other projects Arch bridges Suspension Bridges Railway and High Speed Composite Bridges Road Composite Bridges Railway and High Speed Concrete Bridges Road Concrete Bridges Bridge over river Grande Location Brazil Structural typology Steel concrete composite deck with concrete haunches at central piers Property VALEC Builder Tiisa Brafer Work scope Detail Design and Construction Engineering Technical data Overall length 250 m Span lengths 62 5 125 62 5 Width 6

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=318&project_category_id=10 (2016-04-27)
    Open archived version from archive

  • IDEAM - 5 Industrial Buildings for storage of fertilizers in Saudi Arabia
    apart are about 40 high and span 71 m At about 26 m above the ground a platform provides the running surface for a device tripper for transport and placement of stored fertilizers the buildings plan dimensions and tripper weights are Port área 3 buildings 71x350 m2 and 55 tripper Process área 2 buildings 71 160 m2 and 32 tripper Property Saudi Arabian Mining Company Ma Aden Builder Intecsa Makiber

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=319&project_category_id=3 (2016-04-27)
    Open archived version from archive

  • IDEAM - Doha Link
    and approach bridges Superstructure Segmental post tensioned concrete box girder Foundation drilled concrete piles Construction Approach West span by span Main bridge cantilever Approach East cast in situ and span by span Property State of Kuwait Ministry of Public Works Road Administration Work scope Tender Design build completion and Maintain Sheikh Jaber Al Ahmad Al Sabal Causeway Project Several structures Technical data Overall length 5190 km Approach West 600 m

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=320&project_category_id=6 (2016-04-27)
    Open archived version from archive

  • IDEAM - Cable-Stayed bridge over Barra Canal-Tijuca river
    projects Cable Stayed bridge over Barra Canal Tijuca river Location Rio de Janeiro Brazil Structural typology Cable stayed Steel bridge deck and pylons for a metro line Property Rio de Janeiro Regional Government Builder Queiroz Galvao Work scope Independent Check and Technical Assistance Ending year 2 013 Technical data Overall length 240 m Span lengths 165 m steel deck 27 50 47 50 concrete span Width 14 m Curvature radios

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=321&project_category_id=5 (2016-04-27)
    Open archived version from archive

  • IDEAM - The Rt. Herb Gray Parkway Project
    48 67 m Deck widths between 13 19 m Precast girder bridges Lenghts between 32 68 m Máximum spans between 30 35 m Deck widths between 20 40 m Cut and cover tunnels Lenghts between 120 240 m Máximum spans between 20 36 m Footbridges Lenghts between 20 60 m Deck widths 4m Property Ontario Ministry of Transport MTO Builder Parkway Infrastructure Acciona Dragados Fluor Work scope Independent Design Checking

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=322&project_category_id=5 (2016-04-27)
    Open archived version from archive

  • IDEAM - Viaducto over Almonte river
    studies and Project drafts Other projects Viaducto over Almonte river Location Madrid Portuguese Border HSRL Cáceres Spain Structural typology Prestressed cocnrete deck supported on piers and on a reinforced concrete arch Property ADIF National Railway Infrastruture Manager Builder FCC Construcción Work scope Independent check and Technical Assistance Ending year 2 015 Technical data Overall length 996 m Span lengths 36 5x45 384 arch 7x45 36 Width 14 m back Jorge

    Original URL path: http://www.ideam.es/?a=3&aa=2&project_id=323&project_category_id=5 (2016-04-27)
    Open archived version from archive



  •