archive-es.com » ES » O » OVH.ES

Total: 788

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • OVH Tasks  
    Task Type Maintenance Category Rbx2b Status CLOSED Percent Complete Details We are switching the service to master pools impacted pcc 000777 pcc 000778 pcc 000780 pcc 000781 pcc 000784 pcc 000785 pcc 000906 pcc 000907 pcc 000908 Date Monday 28

    Original URL path: http://status.ovh.es/?do=details&id=10935 (2015-10-15)
    Open archived version from archive


  • OVH Tasks  
    Details We will update this pair n6 to connect fex 2348 We will perform this update at 10 30 CEST or 4 30 local time on October 1st Date Monday 28 September 2015 19 20PM Reason for closing Done Comments

    Original URL path: http://status.ovh.es/?do=details&id=10933 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    to Project E mail Task Type Incident Category exchange Status CLOSED Percent Complete Details It is currently impossible to create new accounts on all exchange platforms The message Destination infra is incorrect appears on the screen Date Monday 28 September

    Original URL path: http://status.ovh.es/?do=details&id=10932 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    Task Type Maintenance Category Backend Core Status CLOSED Percent Complete Details To improve service quality we just made a modification on the internal routing of special numbers to solve DTMF problems that might arise in specific configurations Date Monday 28

    Original URL path: http://status.ovh.es/?do=details&id=10931 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    intercommunication between our router rbx 1 6k and eur 1 4m with JumboFrame for dedicated connect The maintenance will take place around 3pm There is no impact expected during the switch from mtu 1500 to mtu 9100 We will start a new session ospf between rbx and eur with the new MTU then migrate traffic The first session is isolated we can go through MTU 9100 without difficulty Date Monday

    Original URL path: http://status.ovh.es/?do=details&id=10929 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    communicating with MTS SAP IPQOS MGR opcode MTS OPC ETHPM PORT BRINGUP RID PORT Ethernet106 1 26 About did not Ethpm Receive a Link UP from the driver on time gold Had an internal error check Port Client and Ethpm logs and debug i We are in the process of debug with Cisco however the only way to return to normal operation is to reload sbg2 16a n56 We will

    Original URL path: http://status.ovh.es/?do=details&id=10928 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    move the uplinks of this pair to other equipment This operation which usually develops without impact aims to increase the capacity of external links Maintenance will begin on Friday October 2nd at 6am Service area 151 80 47 0 24

    Original URL path: http://status.ovh.es/?do=details&id=10927 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    Task Type Maintenance Category Gravelines Status Planned Percent Complete Details We will move the uplinks of this pair to other equipment This operation which usually develops without impact aims to increase the capacity of external links Maintenance will begin on Friday October 2nd at 6am Service area 151 80 33 0 24 151 80 34 0 24 151 80 35 0 24 151 80 36 0 24 Impact previewed 0

    Original URL path: http://status.ovh.es/?do=details&id=10926 (2015-10-15)
    Open archived version from archive



  •