archive-es.com » ES » O » OVH.ES

Total: 788

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • OVH Tasks  
    has not been interrupted Investigations are processing in order to recover the optical path as soon as possible Below the list of impacted sites by the optical cutoff PLR75 RKE75 DAN75 DID75 PAS75 VAU75 GOB75 PHA75 PPE75 CEV75 LIT75 BOB75 AUT75 INV75 BNE75 MUR75 SEG75 RAS75 MNA75 Date Thursday 31 May 2012 01 39AM Reason for closing Done Comments 2 Comment by OVH Tuesday 22 May 2012 16 19PM PAS75

    Original URL path: http://status.ovh.es/?do=details&id=2792 (2015-10-15)
    Open archived version from archive


  • OVH Tasks  
    Percent Complete Details The LAL69 optical equipment is facing a multiplexer issue The site is no longer secured The traffic is not impacted The second optical path took over We are searching the origin of the failure Date Saturday 02 June 2012 00 27AM Reason for closing Done Comments 1 Comment by OVH Thursday 31 May 2012 01 48AM Security is back to normal The multiplexer wasn t the cause

    Original URL path: http://status.ovh.es/?do=details&id=2839 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    site We check the links Comment by OVH Wednesday 06 June 2012 15 47PM The interruption is not yet localized We seek the origin of the interruption on the fiber Comment by OVH Wednesday 06 June 2012 17 02PM The optical link is operational in the sense JOL13 FER13 whereas the light is turned off in the direction FER13 JOL13 We expect an FT audit in the dispatchers rooms Comment

    Original URL path: http://status.ovh.es/?do=details&id=2885 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    failure Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETH PORT CHANNEL 5 PORT DOWN port channel127 Ethernet2 5 is down Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETH PORT CHANNEL 5 FOP CHANGED port channel127 first operational port changed from Ethernet2 16 to none Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETH PORT CHANNEL 5 FOP CHANGED port channel127 first operational port changed from Ethernet2 15 to Ethernet2 16 Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETHPORT 5 IF DOWN LINK FAILURE Interface Ethernet2 3 is down Link failure Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETH PORT CHANNEL 5 PORT DOWN port channel127 Ethernet2 4 is down Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 02 UTC ETH PORT CHANNEL 5 PORT DOWN port channel127 Ethernet2 3 is down Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 01 UTC ETHPORT 5 IF DOWN LINK FAILURE Interface Ethernet2 2 is down Link failure Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 01 UTC ETH PORT CHANNEL 5 PORT DOWN port channel127 Ethernet2 2 is down Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 01 UTC last message repeated 2 times Jun 8 15 30 24 th2 10 n5 2012 Jun 8 13 30 01 UTC Jun 8 13 30 01 KERN 3 SYSTEM MSG pfm gem hp removal thread gem hotlplug unregister successful kernel Jun 8 15 30 23 th2 10 n5 2012 Jun 8 13 30 00 UTC BTCM

    Original URL path: http://status.ovh.es/?do=details&id=2896 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    Percent Complete Details SFR is currently performing work tasks on our fiber between the sites in Brignais BG469 and Vénissieux VEN69 These tasks will not impact our client traffic The security of the optical buckle plays its role perfectly All

    Original URL path: http://status.ovh.es/?do=details&id=2945 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    Status CLOSED Percent Complete Details We have a loop problem on the nexus for the vlan that manages PPP connections on DSLAM OVH It affects customers that were migrated in noBox for noTV modems were reconfigured during migration and are no impacted by this problem Date Friday 22 June 2012 12 09PM Reason for closing Done Comments 1 Comment by OVH Friday 22 June 2012 12 09PM The nexus that

    Original URL path: http://status.ovh.es/?do=details&id=2953 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    BAS SFR has currently a hardware problem A change of the chassis is in progress Some suscribers in the following regions are impacted 60 80 27 Date Tuesday 26 June 2012 18 24PM Reason for closing Done Comments 1 Comment

    Original URL path: http://status.ovh.es/?do=details&id=2956 (2015-10-15)
    Open archived version from archive

  • OVH Tasks  
    Status CLOSED Percent Complete Details A problem on an SFR BAS in the 81 and 12 prevents some accesses for mounting their PPP session Date Monday 02 July 2012 13 14PM Reason for closing Done Comments 1 Comment by OVH

    Original URL path: http://status.ovh.es/?do=details&id=2977 (2015-10-15)
    Open archived version from archive



  •